DC -- Capitol Hill -- Capitol Power Plant (25 E St SE):
- Bruce Guthrie Photos Home Page: [Click here] to go to Bruce Guthrie Photos home page.
- Recognize anyone? If you recognize specific folks (or other stuff) and I haven't labeled them, please identify them for the world. Click the little pencil icon underneath the file name (just above the picture). Spammers need not apply.
- Copyrights: All pictures were taken by amateur photographer Bruce Guthrie (me!) who retains copyright on them. Free for non-commercial use with attribution. See the [Creative Commons] definition of what this means. "Photos (c) Bruce Guthrie" is fine for attribution. (Commercial use folks including AI scrapers can of course contact me.) Feel free to use in publications and pages with attribution but you don't have permission to sell the photos themselves. A free copy of any printed publication using any photographs is requested. Descriptive text, if any, is from a mixture of sources, quite frequently from signs at the location or from official web sites; copyrights, if any, are retained by their original owners.
- Accessing as Spider: The system has identified your IP as being a spider.
IP Address: 18.188.20.56 -- Domain: Amazon Technologies
I love well-behaved spiders! They are, in fact, how most people find my site. Unfortunately, my network has a limited bandwidth and pictures take up bandwidth. Spiders ask for lots and lots of pages and chew up lots and lots of bandwidth which slows things down considerably for regular folk. To counter this, you'll see all the text on the page but the images are being suppressed. Also, some system options like merges are being blocked for you.
Note: Permission is NOT granted for spiders, robots, etc to use the site for AI-generation purposes. I'm sure you're thrilled by your ability to make revenue from my work but there's nothing in that for my human users or for me.
If you are in fact human, please email me at guthrie.bruce@gmail.com and I can check if your designation was made in error. Given your number of hits, that's unlikely but what the hell.
- Help? The Medium (Email) links are for screen viewing and emailing. You'll want bigger sizes for printing. [Click here for additional help]
|
[1]
CPOWER_210117_01.JPG
|
[2] CPOWER_210117_04.JPG
|
[3] CPOWER_210117_06.JPG
|
[4] CPOWER_210117_10.JPG
|
- Specific picture descriptions: Photos above with "i" icons next to the bracketed sequence numbers (e.g. "[1] ") are described as follows:
- CPOWER_210117_01.JPG: Capitol Power Plant
- AAA "Gem": AAA considers this location to be a "must see" point of interest. To see pictures of other areas that AAA considers to be Gems, click here.
- Wikipedia Description: Capitol Power Plant
From Wikipedia, the free encyclopedia
The Capitol Power Plant is a fossil-fuel burning power plant which provides steam and chilled water for the United States Capitol, the Supreme Court, the Library of Congress and 19 other buildings in the Capitol Complex. Located at 25 E St SE in southeast Washington, D.C., it is the only coal-burning power plant in the District of Columbia, though it mostly uses natural gas. The plant has been serving the Capitol since 1910, and is under the administration of the Architect of the Capitol (see 2 U.S.C. § 2162). Though it was originally built to supply the Capitol complex with electricity as well, the plant has not produced electricity for the Capitol since 1952. Electricity generation is now handled by the same power grid and local electrical utility (Pepco) that serves the rest of metropolitan Washington.
According to the U.S. Department of Energy, the facility released 118,851 tons of carbon dioxide in 2007. In 2009 it switched to using natural gas, unless coal was needed for backup capacity. In 2013, it was announced that the Capitol Power Plant would add a Cogeneration Plant to the CPP that will use natural gas in a combustion turbine in order to efficiently generate both electricity and heat for steam, thus further reducing emissions. A 7.5 megawatt cogeneration facility was completed at the CPP in 2018.
History
The power plant was constructed under the terms of an act of Congress passed on April 28, 1904, authorized in order to support two new office buildings that were then being planned. Now known as the Cannon House Office Building and the Russell Senate Office Building, these new offices required a substantial increase in energy to Capitol Hill. In addition, the U.S. Capitol and the Library of Congress would also receive power from the new plant, along with all future buildings to be constructed on the Capitol campus.
Originally called the "Heating, Lighting, and Power Plant," the Capitol Power Plant was one of the earliest 25-cycle alternating current electric-generating facilities in the United States. The original steam boilers were replaced in 1923. In 1950, the steam boilers were modernized and replaced with coal-fired steam generators; at the same time, the plant's electricity generating capacity had reached its limit, and it was decided to abandon electricity production in favor of the local electrical utility. Expansion of the plant to support additional new construction was authorized in 1958, 1970, and in the early 21st century to support the opening of the Capitol Visitor Center.
Controversy
Senators from coal mining states blocked a proposal in 2000 to use cleaner fuel for the plant. Senators Mitch McConnell (Republican of Kentucky) and Robert Byrd (Democrat of West Virginia), both from coal mining states, used their influence as two of the Senate's most senior members to block this proposal. In May 2007, CNN reported that two companies, International Resources Inc. and the Kanawha Eagle mine, have a contract to supply a combined 40,000 tons of coal to the plant over the next two years. But this statement does not say when "the next two years" begins. The companies gave a combined $26,300 to the McConnell and Byrd campaigns for the 2006 election.
In June 2007, Speaker of the House Nancy Pelosi announced the "Greening the Capitol" initiative. The initiative's goal is to make the Capitol carbon neutral, and the power plant is a major obstacle to achieving this objective. In November 2007, Daniel Beard, the House's Chief Administrative Officer, announced that he would purchase $89,000 worth of carbon offsets for 30,000 tons of carbon emissions. Beard made the purchase from the Chicago Climate Exchange. On February 28, 2009, Pelosi and Senate Majority Leader Harry Reid sent a letter to the Architect of the Capitol asking him to create a plan to switch the power plant entirely to natural gas by the end of 2009. This letter came just three days before a March 2009 scheduled protest (which happened despite the change).
In response to the letter from Pelosi and Reid, the Architect of the Capitol replied on May 1, 2009 that the plant had been transitioning to natural gas and was prepared to switch completely to that fuel, using coal only as a backup source. In 2008, the plant had operated on about 65% natural gas and 35% coal, compared to 58% coal in 2005. This did not end the Capitol complex's reliance on coal. Electricity is supplied by a local utility company that uses coal as a power source. By 2011, coal use at the CPP was down to 5%.
In 2013, the Architect of the Capitol announced that it had "identified the construction of a cogeneration plant as the most environmentally and economically beneficial way to meet its goal to use natural gas 100% of the time." The new cogeneration unit would use 100 percent natural gas to provide power for the 23 buildings of the Capitol complex, which includes the Capitol Building, the House and Senate office buildings, the Supreme Court, the U.S. Botanic Garden and the Library of Congress buildings, among others. Not only will it reduce the use of coal on-site for the chillers and boilers, but it would provide 93% of the facility's electricity. This would allow it to replace inefficient, 45% coal-generated electricity bought off the grid with more efficiently generated, on-site electricity that uses no coal. They completed the permitting process for this facility in June 2013.
- Bigger photos? To save server space, the full-sized versions of these images have either not been loaded to the server or have been removed from the server. (Only some pages are loaded with full-sized images and those usually get removed after three months.)
I still have them though. If you want me to email them to you, please send an email to guthrie.bruce@gmail.com
and I can email them to you, or, depending on the number of images, just repost the page again will the full-sized images.
- Connection Not Secure messages? Those warnings you get from your browser about this site not having secure connections worry some people. This means this site does not have SSL installed (the link is http:, not https:). That's bad if you're entering credit card numbers, passwords, or other personal information. But this site doesn't collect any personal information so SSL is not necessary. Life's good!
- Photo Contact: [Email Bruce Guthrie].