SPIKVC_160714_067
Existing comment:
A Finishing Touch:
A final group of workers added a finishing touch to the hastily-built road. Ties were added and gravel ballast filled-in to anchor the track. Spikes and joints were secured and final rail alignment checked.

Government inspectors traveled to the end-of-track to check the quality of construction. An inspector's stamp of approval was needed for the railroads to collect financial subsidies.
Proposed user comment: