SPIKVC_160714_048
Existing comment:
Leveling a Path
Grading crews were the next cog in the assembly line. Workers used simple hand tools, scrapers, and horse-drawn dumpcarts to mold the terrain in preparation for tracklaying. Cuts and fills altered the land's slope to conform to the 2 percent maximum grade allowed by the Pacific Railroad Act.
Proposed user comment: