GLC_030604_098
Existing comment:
The cleared out area is the spillway. It was used during one period of unusually high water in the early 1980's. Each of the colored rectangles along the dam is an intake system for each turbine. You'll notice there are eight intakes, like there were eight turbines. Typically, they don't need to have them all operating at once.
Proposed user comment: